Foundations for footbridge over flood drain.
Two twelve-meter hardwood beams (from a certificated source) were delivered to the site on 27 Sept 2001.
The Environment Agency deliver the bridge beams.
Bridge beam being towed.
Contractor attaching sling to winch beam across flood drain.
Contractor about to winch beam across.