Trustees and volunteers delivering railings to the meadow. The trustees are
grateful to the Environment Agency and the Oxfordshire County Council for
supplying us with materials.
Volunteers constructing the railings for the sluice bridge using
Kee-Klamp fittings and piping.
Constructing railings
Fixing base plates
The base plates were fixed to the concrete bridge deck with bolts embedded
in epoxy resin.
The Kee-Klamp fittings were secured with Allen screwa. The metal has been
primed with epoxy self-etch primer.
Kee-Klamp fittings
Painting
Volunteers painting the railings with Hammerite metallic paint.
The job done! The bridge over the sluice is now safe for public access.
Finished bridge
Bird spotting
The sluice bridge is an ideal site for watching the many birds that frequent
Buck Pool, including kingfisher and heron.